Connect with us

Slider

Schools in Tsholotsho destroyed by heavy rains, learners left conducting lessons under the trees

Published

on

BY NOKUTHABA DLAMINI 

Last week’s heavy rains have left a trail of destruction in Tsholotsho, with two schools severely affected.

Advertisement

Nembe Primary School and Nembe Secondary School suffered significant infrastructure damage, displacing learners and prompting calls for urgent assistance.

 

According to Ward 22 Councillor Nkululeko Ndebele, the rains destroyed wall blocks, scattered blanks everywhere, and damaged walls at Nembe Primary School.

“The wall block of grade three and four was destroyed, and the office of the staff, administration block, and solar panels were also damaged,” he said.

Advertisement

At Nembe Secondary School, the block used by Form One and Two students was destroyed, leaving learners without classrooms.

“Currently, the children are learning under the trees because no action has been taken,” Councillor Ndebele lamented.

The District Schools Inspector visited the site on Monday to assess the damage, and a further visit is scheduled for today to determine the extent of the destruction.

Advertisement

Councillor Ndebele appealed for international assistance, citing the economic situation and drought ravaging the communities.

“Parents cannot afford to rebuild the schools, and we need help from anyone willing to assist,” he said.

Ndebele says the schools, built in the 1950s, have never been maintained, and their age has contributed to the extent of the damage.

“We are getting into the rain season, and we urgently need help to rebuild and restore these schools,” Councillor Ndebele emphasized.

Advertisement

 

Advertisement
Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

National

Zimbabwe’s power crisis: A new dawn?

Published

on

BY NOKUTHABA DLAMINI 

In a bid to alleviate the crippling load shedding that has left Zimbabweans frustrated and angry, ZESA Holdings chairman Sydney Gata has announced a 720-megawatt thermal power project.

Advertisement

This ambitious initiative aims to add much-needed megawatts to the national grid, bringing relief to households and businesses alike.

Speaking at the launch, Gata acknowledged the nation’s pain, saying, “I know you are angry and frustrated about the load shedding. I am tired of being insulted for these power cuts.”he was quoted at a video captured by the Ministry of Information.

His words echoed the sentiments of many Zimbabweans who have grown weary of the constant blackouts.

Advertisement

The project, set to be completed by December 2025, will be complemented by a 200-megawatt solar station and additional solar projects in Selous and Gweru.

This multi-pronged approach is expected to mark the end of load shedding in Zimbabwe.

Gata emphasized that this initiative is one of 18 projects spearheaded by companies in mining, industry, and commerce.

Advertisement

These projects were invited after the Kariba disaster, which highlighted the need for alternative power sources.

 

Advertisement
Continue Reading

National

Victoria Falls mayor suspends town clerk amid corruption allegations

Published

on

BY STAFF REPORTER

Victoria Falls Mayor Councillor Prince Moyo has suspended Town Clerk Ronnie Dube with immediate effect amid allegations of abuse of office and corruption.

Advertisement

According to a letter seen by this publication, Dube’s suspension is in terms of Section 139 of the Urban Councils Act, Chapter 29:15.

 

The letter, dated November 2, outlines several allegations against Dube, including:

Advertisement

– Allocating stands 9816 and 9945 to Priscilla Thabolo and Portia Saritsozo without following Council procedures

– Awarding a contract to Cascade Engineering Consultants without following tender processes

– Selling and transferring stand 1829 in Chinotimba Township without receiving payment or following procedures

Advertisement

The letter states that these allegations, amongst others, have led to Dube’s suspension, and he is required to leave Council offices immediately.

“The Council will notify you on the way forward,” the letter reads.

This publication will continue to follow the story and provide updates as more information becomes available.

Advertisement
Continue Reading

National

How long will Zimbabweans endure darkness?

Published

on

BY FARAI MACHAMIRE

Zimbabweans face at least two more years of power shortages as the government works to stabilize electricity generation and meet demand, the Minister of Energy and Power Development, Edgar Moyo, has revealed.

Advertisement

The country’s daily power generation currently averages 1,232 megawatts (MW) against a demand of 1,735 MW, with imports and load-shedding bridging the shortfall.

Speaking in Parliament (Senate) on Wednesday and quoted on ZimLive, Moyo painted a grim picture of the nation’s energy landscape but assured citizens that ongoing and upcoming projects would eventually close the gap.

“The refurbishment of Hwange Power Station’s Unit 5 will add 160 MW to the national grid by August 2026, helping address the electricity shortfall,” he said. Additionally, Unit 7 at Hwange will undergo maintenance in January 2025 to ensure its long-term efficiency.

Advertisement

 

Water shortages have further constrained electricity generation at the Kariba Power Station, which produces only 104 MW out of its 1,050 MW capacity due to low water levels.

However, Moyo highlighted a 68.75% increase in water allocation for power generation in 2025, stemming from an anticipated above-normal rainfall season.

“This will significantly increase power availability next year,” he noted.

Advertisement

A recent nationwide blackout on November 24 disrupted the fragile energy system, with power restored after seven hours. The cause of the disturbance is still under investigation.

To mitigate load-shedding, the government plans to rely on Independent Power Producers (IPPs), which currently contribute over 200 MW, and accelerate renewable energy projects like solar farms. Projects such as the Batoka Gorge Hydro Electric Plant, with a potential capacity of 1,200 MW, and the Devils Gorge Hydro Project, expected to generate 600 MW, are also in development.

“The repowering of Hwange units 1 to 6 over the next 48 to 60 months will restore the station’s capacity to 840 MW, significantly stabilizing the power supply,” Moyo said.

Advertisement

On nuclear energy, the minister disclosed that the government is exploring prospects with Russia’s ROSATOM and the International Atomic Energy Agency (IAEA).

Thirty Zimbabwean students are currently training in nuclear physics abroad as part of the initiative.

Despite these efforts, Moyo acknowledged the challenges ahead. “Without significant interventions, the forecast demand of 1,735 MW will continue to outstrip supply, resulting in ongoing load curtailment,” he said.

Advertisement

Zimbabwe’s path to reliable electricity hinges on the successful completion of these projects and the implementation of efficient energy policies. For now, the nation must brace for continued power outages.

The prolonged outages, now extending to 18-hours a day, have taken a toll on households and industries, affecting productivity and increasing operational costs for businesses reliant on backup power. Critics argue that the government’s reliance on imports and promises of future projects have not eased the immediate burden on citizens.

SOURCE: ZIMLIVE

Advertisement

Continue Reading

Trending

Copyright © 2022 VicFallsLive. All rights reserved, powered by Advantage