National

Zimbabwe’s power crisis: A new dawn?

Published

on

BY NOKUTHABA DLAMINI 

In a bid to alleviate the crippling load shedding that has left Zimbabweans frustrated and angry, ZESA Holdings chairman Sydney Gata has announced a 720-megawatt thermal power project.

Advertisement

This ambitious initiative aims to add much-needed megawatts to the national grid, bringing relief to households and businesses alike.

Speaking at the launch, Gata acknowledged the nation’s pain, saying, “I know you are angry and frustrated about the load shedding. I am tired of being insulted for these power cuts.”he was quoted at a video captured by the Ministry of Information.

His words echoed the sentiments of many Zimbabweans who have grown weary of the constant blackouts.

Advertisement

The project, set to be completed by December 2025, will be complemented by a 200-megawatt solar station and additional solar projects in Selous and Gweru.

This multi-pronged approach is expected to mark the end of load shedding in Zimbabwe.

Gata emphasized that this initiative is one of 18 projects spearheaded by companies in mining, industry, and commerce.

Advertisement

These projects were invited after the Kariba disaster, which highlighted the need for alternative power sources.

 

Advertisement

Leave a Reply

Your email address will not be published. Required fields are marked *

Trending

Copyright © 2022 VicFallsLive. All rights reserved, powered by Advantage